{"id":3837,"date":"2017-11-27T02:28:19","date_gmt":"2017-11-27T02:28:19","guid":{"rendered":"http:\/\/fieldstonnews.com\/home\/?p=3837"},"modified":"2018-10-20T12:56:46","modified_gmt":"2018-10-20T12:56:46","slug":"tate-update-exclusive-look-inside-librarys-construction","status":"publish","type":"post","link":"https:\/\/fieldstonnews.com\/home\/2017\/11\/tate-update-exclusive-look-inside-librarys-construction\/","title":{"rendered":"Tate Update: An Exclusive Look Inside The Library\u2019s Construction"},"content":{"rendered":"<p><span style=\"font-weight: 400;\"><a href=\"https:\/\/fieldstonnews.com\/home\/wp-content\/uploads\/2017\/11\/Screen-Shot-2017-11-26-at-9.36.42-PM.png\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-3845\" src=\"https:\/\/fieldstonnews.com\/home\/wp-content\/uploads\/2017\/11\/Screen-Shot-2017-11-26-at-9.36.42-PM-300x144.png\" alt=\"\" width=\"945\" height=\"454\" srcset=\"https:\/\/fieldstonnews.com\/home\/wp-content\/uploads\/2017\/11\/Screen-Shot-2017-11-26-at-9.36.42-PM-300x144.png 300w, https:\/\/fieldstonnews.com\/home\/wp-content\/uploads\/2017\/11\/Screen-Shot-2017-11-26-at-9.36.42-PM-768x368.png 768w, https:\/\/fieldstonnews.com\/home\/wp-content\/uploads\/2017\/11\/Screen-Shot-2017-11-26-at-9.36.42-PM-1024x491.png 1024w\" sizes=\"(max-width: 945px) 100vw, 945px\" \/><\/a>Veiled behind a green construction wall lies the elephant on the Quad&#8211;the skeleton of the Tate Library. For over 40 years, the Tate served the Fieldston Middle and Upper student bodies and faculty. Last year, the library was used as a study space that contained an art gallery and the film room, but years of consistent use was taking a toll on the space. During hot school days, the library became unbearable with the lack of an air conditioning system. During A\/B bands, fights would erupt over the shortage of collaborative work spaces.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This year, the Tate is under renovation. Manager of Operations Teddy O\u2019Rourke hopes to solve these problems and more. The plans call for a more open layout on the bottom floor with shorter bookshelves, more tables and more comfortable chairs. On the top level, the library will have many individual study carrels as well as collaborative spaces to replace the several offices. The rooms previously in the back of the top floor will continue to serve the student body as collaborative spaces. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">On the bottom floor, the old film lab, which now functions as the onsight headquarters during this stage of the renovation, will be turned into a programmable space for classes and meetings. In recent weeks the construction team has, \u201cremoved all the plumbing,&#8230;finished up fireproofing, ductwork and installing fan coil units on the second floor,\u201d O\u2019Rourke said. While there is no official date for the library\u2019s reopening, O\u2019Rourke and his team are hoping to have a temporary certificate of occupancy by August 2018, and the student body should be able to utilize the space once again in December 2018.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For a look inside the construction, take a look at Ben Ginsburg\u2019s short film about the renovations below!<\/span><\/p>\n<p><iframe title=\"A Look Inside the Tate Library Renovation\" width=\"1170\" height=\"658\" src=\"https:\/\/www.youtube.com\/embed\/aWj1DofQ_nc?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Veiled behind a green construction wall lies the elephant on the Quad&#8211;the skeleton of the Tate Library. For over 40 years, the Tate served the Fieldston Middle and Upper student bodies and faculty. Last year, the library was used as a study space that contained an art gallery and the film room, but years of consistent use was taking a toll on the space. During hot school days, the library became unbearable with the lack<\/p>\n","protected":false},"author":206,"featured_media":3852,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[318],"tags":[],"coauthors":[297],"class_list":["post-3837","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"jetpack_featured_media_url":"https:\/\/fieldstonnews.com\/home\/wp-content\/uploads\/2017\/11\/unnamed.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/posts\/3837","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/users\/206"}],"replies":[{"embeddable":true,"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/comments?post=3837"}],"version-history":[{"count":9,"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/posts\/3837\/revisions"}],"predecessor-version":[{"id":3851,"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/posts\/3837\/revisions\/3851"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/media\/3852"}],"wp:attachment":[{"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/media?parent=3837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/categories?post=3837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/tags?post=3837"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/fieldstonnews.com\/home\/wp-json\/wp\/v2\/coauthors?post=3837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}